Product Overview
Sanlita’s S11 and S13 series high-voltage three-phase 10kV oil-immersed power transformers are designed for efficient and reliable power distribution in industrial, commercial, and utility applications. Available in capacities from 100KVA to 630KVA, these transformers feature low no-load loss, excellent short-circuit withstand capability, and robust construction. The S13 series offers even higher energy efficiency, meeting the latest energy-saving standards. Each unit is manufactured in our ISO-certified Chinese factory using high-grade silicon steel and oxygen-free copper windings, ensuring long service life and stable performance under demanding conditions.
Technical Specifications
| Parameter | Specification |
|---|---|
| Model | S11 / S13 |
| Phase | Three Phase |
| Rated Voltage (HV) | 10 kV |
| Rated Capacity | 100 / 250 / 315 / 400 / 630 KVA |
| Frequency | 50 / 60 Hz |
| Cooling Method | ONAN (Oil Natural Air Natural) |
| Winding Material | Copper / Aluminum (optional) |
| Insulation Class | A / E / B |
| Standard | IEC 60076, GB 1094 |
Why Choose Sanlita
- Direct factory supply with competitive pricing and no minimum order quantity.
- Experienced R&D team offering customized solutions for voltage, tapping, and accessories.
- Strict quality assurance: 100% routine tests including ratio, resistance, and induced voltage tests.
- Proven export track record to over 30 countries with reliable logistics partners.
- Comprehensive warranty and responsive technical support for peace of mind.
FAQ
Q: What is the difference between S11 and S13 series?
A: The S13 series has lower no-load loss and higher energy efficiency compared to S11, meeting stricter energy-saving standards. Both are suitable for 10kV distribution, but S13 is recommended for projects prioritizing long-term energy savings.
Q: Can I get a custom voltage rating?
A: Yes, Sanlita offers customization for primary and secondary voltages, tap changers, and accessories. Please provide your specific requirements for a tailored solution.
Q: What is the typical lead time for this transformer?
A: Standard models (100-630KVA) typically ship within 15-25 working days after order confirmation. Custom orders may require additional time depending on complexity.
Q: Do you provide test certificates?
A: Absolutely. Each transformer comes with a factory test report. Third-party inspection (e.g., SGS, BV) is also available upon request.
Q: How is the transformer packaged for export?
A: Transformers are securely packed in wooden crates with moisture-proof lining, suitable for sea or air freight. Lifting lugs and documentation are included.







